RustForge by NewCool

Production Rust Audits.
48h. Actionable. Guaranteed.

We audit your Rust codebase for panics, unsafe misuse, and architectural risks. You get a prioritized report with verified fixes. Prepaid. No actionable findings, full refund.

10
Repos audited
0
P0 risks
8
Fixes delivered
1,025+
Tests verified
Marcelo Bazaes

Marcelo Bazaes

Rust Systems Architect

  • Audited 10 production Rust repos — 365 files, 140 unwraps classified, 8 fixes shipped
  • Built a custom static analysis scanner with 15 tests (BUG-1 through BUG-4 detected)
  • Search engine architect: sub-millisecond p99, 27K qps on Tantivy + Qdrant
LinkedIn →

Impact Cases

Summarized social proof: detected risk, expected impact, and immediate action.

LLM Runtime

NaN panic in sampler

partial_cmp().unwrap() across 5 critical inference paths. Fix: total_cmp() eliminates panic on NaN inputs. 88 tests pass.

Agent Core

Hash-chain verification hardened

JSON parse panic in immutable log verify() function. Fix: explicit match returns chain-invalid without crash. 41 tests pass.

Scanner

4 bugs in custom static analysis

False positives from doc comments, method names, string literals, and test indirection. 15 scanner tests, 365 files re-scanned.

What happens after the audit?

Every audit ends with a prioritized findings report. If your team needs execution support, we offer architecture and implementation services starting at $5,000.

[Audit] → [Findings Report] → [Optional: Architecture Support]

This is not a separate product. It's the natural next step when findings require deeper intervention.

See our execution capabilities →

Request Async Scope

Short first contact. Then technical qualification via text, no mandatory call.

To speed up closing and delivery:
  • Define the critical module or service.
  • Main symptom (latency, errors, timeouts).
  • Affected environment (prod/staging).
  • Budget aligned with criticality.

If there's a fit, I'll respond with a scope in 4 bullets + payment link.

Estimated response: same business day.

See Scope Schedule